The Springs,Tishman Speyer
yes
The Springs,Tishman Speyer

The Springs is a 900,000 sqm integrated development by Tishman Speyer. Sika-Membran Window System was used in the project. SikaMembran Window System includes breathable PE membrane (SikaMembran Window Outside) and un-breathable PE membrane (SikaMembran Window inside). Sikaflex sealant areintroduced to bond the membrane on concrete wall.

yes
CHINA EXPO COMPLEX

The China Expo Convention and Exhibition Complex is the largest single block building and exhibition complex in the world with a total construction area of 1.47 million square meters.  It was a challenge to fix the stiffeners for 100,000 squaremeters of clad aluminum on the roof. With Sika-Glaze GG-735, the curing time is only 48 hours withonly about 50% material cost. Sika's flooring systems were applied in the exhibition hall.